Adam's Project Management & Construction Limited
» Services in Trinidad


Construction Management

construction crane on buildingAdam's team-based construction management approach calls for the earliest possible collaboration with the client and design team to envision the project together, define its goals and establish a customized project plan. In our role as construction manager, Adam's professionals draw on a foundation of expertise, leadership and partnership to organize and lead the team to a successful outcome and to complete client satisfaction.

From effective project planning, communications and use of the latest technologies to proactive management of cost, schedule and team – to a system of rigid, safety, quality assurance and other controls – the well-managed construction project is Adam's core competency and a cornerstone of our success.

General Contracting

general contractor meetingAdam's has delivered quality, at-risk general contracting services for our clients since 2001. Our extremely competitive record in the hard-bid market demonstrates our knowledge of current market conditions and also reflects our strong relationships with local trades, enabling us to secure the highest quality at the best possible pricing.

Guaranteed Maximum Price (GMP.)

In an industry where general contracting projects, by their nature, require less involvement and ongoing decision-making by clients, Adam's experts, leaders and partners nonetheless work in partnership with the entire team – including client,architects, engineers, and trade contractors - to represent the best interests of our client and deliver a facility built to the highest standards, every time.

Our contracting services include:

  • Cost monitoring and control
  • Master schedule development and control
  • Management of trade contractors
  • Quality assurance and control
  • Strict safety management
  • Responsive field management

Program Management

For clients who simply don't know where to begin or lack the staff and other resources to develop a project's parameters, Adam's program management is a proven system that offers single point responsibility for successful delivery of a specific construction project, a group of projects or an overall facilities development program.

As program manager, we serve as an extension of our client's organization, assembling the right team and technical resources to meet the unique facilities program challenge. Because our program management fee is based on the staff resources we must deploy to meet the client's needs, our incentive is to provide the highest quality professional services available and is not a function of construction cost.

In this role, we are the "managing partner" responsible to our client for the entire program, leading the effort from pre-design through post-construction for a high quality, cost-effective custom facilities solution.

We offer a full range of program management services, including Master facility plan and feasibility studies, including space need assessments:

program management supplies
  • Master planning
  • Finance planning
  • Concept development
  • Team member selection
  • Programming
  • Design management
  • Planning management
  • Construction management
  • Occupancy planning
  • Facility management

Structural Steel Fabrication & Erection

structural steel fabrication roofAt Adam's we consider the fabrication and erection of steel structures to be one of our core competencies. With many projects successfully completed in this area we believe that our team has the experience necessary to provide a cost effective and timely solution to your structural steel needs.

We fabricate and erect various forms of structural steel including large portal frames, trusses, tubular structures and light extensions including cladding. We often provide structural steel for housing developers and regularly fabricate and erect steel for main contractors in industrial and commercial developments such as shopping centres and multi-story buildings. We own all of our equipment necessary to fabricate and erect a steel structure.

The company has purchased another parcel of land and is in the process of erecting a 16,000 square foot building that will be used as the company's main fabrication workshop. At present the fabrication is carried out from the company's main workshop at Frederick settlement.

The new building will contain sophisticated equipment used in the fabrication of structural steel including Multi-Spindle CNC Automated drilling Machine, Punching Machine Equipped with CNC controlled table, Milling Machines, Arc Welding Machines, Overhead Cranes and Forklifts.